Australian Partners

Harris Environmental Consulting

Harris Environmental Consulting help homeowners, builders and developers secure faster development consent by delivering clear, compliant wastewater, stormwater and bushfire assessment reports.

With 20 years of on-the-ground experience across South-East NSW, Harris Environmental turns complex approval hurdles into simple, stress-free ticks in the box. Homeowners, architects, builders and councils trust us for:

• Headache-free reports that meet council and state regulations first time
• Smarter, site-specific designs that cut costs and protect the environment
• Rapid turnaround, clear communication and practical advice you can act on

From on-site wastewater systems and stormwater quality plans to detailed bushfire hazard assessments, we combine deep technical know-how with a can-do attitude—so your project moves forward, on budget and on schedule.

  • Onsite wastewater assessment (also referred to as land capability assessment or geotechnical assessment) in accordance with Australian Standards/guidelines
  • General stormwater/water quality investigations (equivalent of MUSIC model reports)
  • Floating treatment wetland design and construction and installation
  • Erosion and Sediment Control Plans
  • Soil and Water Management
  • GIS, CAD, Drone aerial photo plans

Bendooley Estate (NSW)

Design of wastewater disposal area to manage 60,000L/d. Undertake soil testing, site analysis, water and nutrient balance to size spray irrigation area,prepare repoprt for council approval, review options for commercial wastewater treratment suppliers and provide necessary information to allow client to select suitable system provider. Oversee the installation and liase with WaterNSW and Council for additional requirements (OEMP).

Willinga Park (NSW)

Undertake soil and site assessment for very large equestrian centre, generating approx 35,000L/d. Prepare the reports that are needed for Council approval in accordance with ASNZ1547(2012) and WatyerNSW guidelines. Also prepare wastewater management reports for seperate management of horse washdown wastewater.

NPWS Depot Beach, Pretty Beach, Pebbly Beach, Montaghue Island (NSW)

Undertake soil and site assessments for NPWS for several sites. Design soil absorption beds, assess soils and water quality as part of ongoing validation reporting requirements.

Scotts College, Kanagaroo Valley (NSW)

Design of new wastewater management system for private boarding school in Sydney Drinking Water Catchment, so subject to Counciol and WaterNSW scrutiny. Proposed new wastewater treatment system and spray irrigation area for approx 25,000L/d wastewater load.

Floating Treatment Wetlands (NSW)

Since 2005 we have developed floating treatment wetlands. We have provided floating wetlands for many Councils and for Sydney Water to undertake trials. our system can be manaufactured off shore using local materials.